Connection Criteria

The criteria for assessing access of a Biomethane Unit to Enaon EDA distribution network relate to objective technical criteria, such as the distance of the unit from the distribution network, the design pressure level, the diameter of the connection pipeline between the Biomethane Unit and the BMU, and the network’s ability to absorb the quantity of biomethane produced, taking into account historical and/or projected demand data.

In addition, pursuant to ar.11 of the Distribution Network Management Code, the quantity of biomethane injected into the distribution network shall be ensured to comply with the requirements of ELOT EN 16723-1, “Natural gas and biomethane for use in transport and biomethane for injection in natural gas networks – Part 1: Specifications for biomethane for injection in natural gas networks”.

In case of reverse flow from the Distribution Network to the Transmission System, the biomethane injected into the NNGTS shall meet the corresponding Quality Specifications set out in Annex [I] of the NNGTS Management Code, as applicable.

A) Criteria & Methodology for Assessing a Connection Request

The Operator assesses connection requests in accordance with the following criteria:

The assessment methodology comprises an initial review of the information contained in the connection request, hydraulic simulation of the network, assessment of the possibility of reverse flow (when required) based on the unit’s proximity to the Transmission System, and, finally, determination of the optimal solution.

The stages of the technical assessment of the Connection Request are described in detail below:

Technical evaluation stage

Initial assessment of the Unit’s location in relation to the existing and planned geographical boundaries of Enaon EDA’s areas of activity, as defined in the Distribution Licence and the Operator’s applicable approved Development Plan.

Technical evaluation stage

Assessment of the distance of the Biomethane Unit from the nearest adjacent Low- and Medium-Pressure distribution networks of Enaon EDA. At this stage, potential connection points are also identified, depending on the distance and on the possible presence of geometric obstacles (water channels, streams, culverts, etc.) and special crossings (e.g. national roads).

Technical evaluation stage

Analysis of hourly consumption data over a three-year period for each autonomous system.
Due to the continuous development of the distribution networks in the Rest of Greece (distribution networks other than those in the regions of Attica, Thessaloniki and Thessaly), the above data may need to be reassessed following the period during which minimum consumption levels are observed in the distribution networks (normally during the summer period).

An autonomous system is defined as:

  • Medium-pressure distribution network systems supplied by one or more Distribution Network Entry Points (City Gates)
  • Remote medium- or low-pressure distribution network systems supplied by one or more Distribution Network Entry Points (LNG regasification unit or CNG decompression unit)
  • Operational Low-Pressure (4 bar) distribution network systems consisting of one or more interconnected 4-bar operational sectors, supplied by one or more MR 19/4 distribution stations
Technical evaluation stage

Assessment of the absorption rate of the biomethane to be injected, based on the following methodology:

The assessment is performed at two levels: (a) overall for the autonomous system and (b) locally for each case.

a) Overall assessment of the autonomous system:

By analysing the estimated hourly consumption at the Delivery Points of the autonomous system under consideration and taking into account the maximum production capacity of the Unit for which connection is requested, the absorption rate is determined as the percentage of the Unit’s annual operating hours during which consumption in the distribution network exceeds the maximum production capacity, relative to the total number of hours in a year (24 × 365).

Where the connection process for other biomethane units within the specific autonomous system is in progress, the absorption rate under consideration shall also take into account the maximum production capacity of those other units.

Where the absorption capacity is less than 100%, an increase in the absorption rate shall be considered by proposing to the applicant Producer reduced volumes of biomethane injection compared with the quantities stated in the Connection Request during periods of low consumption in the distribution network.

The above methodology may incorporate Delivery Points of the distribution network that provide increased demand during periods of overall low network consumption, additionally identifying the risk that the biomethane intended for injection may not be absorbed in the event of interruption or reduction of consumption at the aforementioned Delivery Points.

Where more than one candidate network is available for connection of the Unit, the Low-Pressure network shall be selected, provided that a satisfactory absorption rate can be achieved. Alternatively, the Medium-Pressure distribution network shall be selected.

b) Local assessment (per Biomethane Unit for which connection is requested)

At this stage, the network under consideration is modelled using three annual consumption scenarios for the distribution network (max, mid, low), taking into account the location of the Unit and its maximum production capacity, as well as the possible presence of other Biomethane Units that are in the process of being connected to the distribution network.

The results of this process are:

  1. Confirmation of the ability to inject biomethane under all scenarios.
  2. Sizing of the required network extension, taking into account the planned implementation of other projects (development, reinforcement, etc.).
  3. For connection to Medium-Pressure networks, assessment of the need for operation of a compression unit at the outlet of the BMU.

Subsequently, an on-site inspection is carried out in the area where the Unit is to be located, during which, in addition to checking the route of the connection pipeline, any geometric obstacles (water channels, streams, culverts, etc.), special crossings (e.g. national roads), and any other useful information that can be collected are identified.

Upon communication with the applicant Producer and taking into account the Connection Request with regard to the indicative location of the BMU, an on-site inspection is carried out to assess the siting of the BMU within the area made available by the Producer inside the Unit.