Connection Solutions for a Biomethane Unit
Home › Procedure and Criteria for Biomethane Production Unit access to the Distribution Networks of Enaon EDA › Connection Solutions for a Biomethane Unit
Connection Solutions for a Biomethane Unit
Distribution networks are characterized by broad geographical dispersion and, at the same time, by generally varying volumes of gas distributed on both a seasonal and daily basis, which may result in corresponding limitations on their capacity to absorb the quantities of biomethane injected into them.
A Biomethane Production Unit may be connected to the distribution network in the following ways, depending on the network’s ability to absorb the total quantity of biomethane produced:

Direct Connection
Connection to the distribution network with the capacity to absorb the total quantity of biomethane produced, as determined at the stage of the conclusion of the Biomethane Unit Connection Agreement.

Connection with Reverse Flow Operation
Connection to the distribution network combined with reverse flow operation towards the Transmission Network, for the transfer of the surplus quantity of biomethane that cannot be received by the distribution network.
Depending on the characteristics of each connection request, the distance of the biomethane unit from the distribution network, the technical characteristics of the network, the production capacity of the unit and the applicable topological conditions, a different connection solution may need to be designed in order to meet objective technical criteria as well as capacity management criteria.
Direct Connection.
In this case, the entire quantity of biomethane produced and agreed in the Connection Agreement may be received for injection into the distribution network, potentially including a compression facility.
The works required to connect the Biomethane Unit to the distribution network, which collectively constitute the Connection Works, are as follows:
- Construction of the Connection Pipeline from the distribution network to the Biomethane Metering Unit (BMU) of the Biomethane Unit.
- Installation of a Biomethane Metering Unit (BMU). including at least:
- meter;
- flow computer or volume corrector (PTZ);
- gas chromatograph;
- telemetry system and data logger;
- odorant injection system;
- biomethane flow shut-off device;
- Compression facility, where required for injection of biomethane into the Transmission System or the Distribution Network.
Direct Connection
In this case, the entire quantity of biomethane produced and agreed in the Connection Agreement may be received for injection into the distribution network, potentially including a compression facility.
The works required to connect the Biomethane Unit to the distribution network, which collectively constitute the Connection Works, are as follows:
- Construction of the Connection Pipeline from the distribution network to the Biomethane Metering Unit (BMU) of the Biomethane Unit.
- Installation of a Biomethane Metering Unit (BMU). including at least:
- meter,
- flow computer or volume corrector (PTZ),
- gas chromatograph,
- telemetry system and data logger,
- odorant injection system,
- biomethane flow shut-off device
- Compression facility, where required for injection of biomethane into the Transmission System or the Distribution Network.
Connection with Reverse Flow Operation
In this case, the joint assessment of the technical characteristics of the network and the production capacity of the biomethane unit leads to consideration of a solution involving connection of the Biomethane Unit’s BMU to the distribution network and parallel operation of a reverse-flow mechanism towards the Transmission System.
The additional works required for connection of the Biomethane Unit to the distribution network and operation of the reverse-flow system are as follows:
- Construction of a connection pipeline from a selected point of the distribution network to the inlet valve of the compression station of the Transmission System.
- Construction of a compression station.
- Construction of an odor removal unit (where applicable).
- Construction of a connection pipeline from the compression station to the selected point of DESFA’s Transmission System.
Under ar.9 of Law no.5215/2025, the Distribution Network Operator shall undertake construction of the connection pipeline from a selected point of the distribution network to the inlet valve of the compression station of the Transmission System, while DESFA shall undertake the remaining works described above.
It is noted that implementation of this solution is subject to completion of the following steps:
- A) Assessment by the Distribution Network Operator of the need for reverse flow towards the Transmission System during the Connection Study stage (Chapter 5, Step 2), due to the inability of the distribution network to fully absorb the biomethane produced.
- B) Joint proposal by the Distribution Network Operator and DESFA to RAEWW, documenting the technical and economic feasibility of the specific solution.
-
C) Approval by RAEWW.