Connection Solutions for a Biomethane Unit

Connection Solutions for a Biomethane Unit

Distribution networks are characterized by broad geographical dispersion and, at the same time, by generally varying volumes of gas distributed on both a seasonal and daily basis, which may result in corresponding limitations on their capacity to absorb the quantities of biomethane injected into them.

A Biomethane Production Unit may be connected to the distribution network in the following ways, depending on the network’s ability to absorb the total quantity of biomethane produced:

Direct Connection

Connection to the distribution network with the capacity to absorb the total quantity of biomethane produced, as determined at the stage of the conclusion of the Biomethane Unit Connection Agreement.

Connection with Reverse Flow Operation

Connection to the distribution network combined with reverse flow operation towards the Transmission Network, for the transfer of the surplus quantity of biomethane that cannot be received by the distribution network.

Depending on the characteristics of each connection request, the distance of the biomethane unit from the distribution network, the technical characteristics of the network, the production capacity of the unit and the applicable topological conditions, a different connection solution may need to be designed in order to meet objective technical criteria as well as capacity management criteria.

Direct Connection.

In this case, the entire quantity of biomethane produced and agreed in the Connection Agreement may be received for injection into the distribution network, potentially including a compression facility.

The works required to connect the Biomethane Unit to the distribution network, which collectively constitute the Connection Works, are as follows:

Direct Connection

In this case, the entire quantity of biomethane produced and agreed in the Connection Agreement may be received for injection into the distribution network, potentially including a compression facility.

The works required to connect the Biomethane Unit to the distribution network, which collectively constitute the Connection Works, are as follows:

Connection with Reverse Flow Operation

In this case, the joint assessment of the technical characteristics of the network and the production capacity of the biomethane unit leads to consideration of a solution involving connection of the Biomethane Unit’s BMU to the distribution network and parallel operation of a reverse-flow mechanism towards the Transmission System.

The additional works required for connection of the Biomethane Unit to the distribution network and operation of the reverse-flow system are as follows:

Under ar.9 of Law no.5215/2025, the Distribution Network Operator shall undertake construction of the connection pipeline from a selected point of the distribution network to the inlet valve of the compression station of the Transmission System, while DESFA shall undertake the remaining works described above.

It is noted that implementation of this solution is subject to completion of the following steps: